- Initial Investigation Stage
- Regeneration and Development Consultancy
- Design Monitoring
- Concept Elaboration
- Order consulting
|
Design Monitoring
Work with architects requires understanding their mentality and ability to take into account not only the Construction Standards and Rules (SNiP), but also the human factor. This is one of the strengths of each project leader in our company: S.A.Ricci / King Sturge has successfully implemented the integration of foreign architects at an international level to work in Russian design bureaus. The company is experienced in international tender arrangements for design bureau selection, keeping design costs to a minimum, and subsequent design monitoring.
In some instances, even the leading design bureaus make mistakes, especially in the case of multifunctional facilities. Thus, it is the pre-design concept that require coordination with the participation of experts from our company. According to our experience, sometimes it is necessary to revise the floor-by-floor plans up to 10 times, in order to find the optimum variant for the existing layout of the land plot being developed. Certainly, it would be much more profitable for any investor to pay more attention to the development stage than to try to eliminate design mistakes at a built facility later on. If you desire to create an ideal project, you should address our company.
|
|
News
“Sberbank”conquered“Danilovsky Fort”
OAO "Gals-Development" and ZAO "Sberbank Technology" signed a long-term lease agreement in the "Danilovsky Fort" business center , located on Novodanilovskaya wharf. The lease is for two buildings with a total rentable area of 19914.4 square meters
Experts advice for investing in real estate
The state of the global economy calls for investors to think hard as to where to invest their money
|
|